Croydon Road

Mixed-use development delivering affordable homes and retail space
Sinden was appointed by Clarion to deliver a mixed-use development comprising 48 affordable rent apartments above a Lidl supermarket, with a 2.5-storey basement car park beneath.
Located on a constrained town-centre site adjacent to a main railway line, the project presented significant logistical and engineering challenges. The proximity of the railway required close collaboration with Network Rail, while the restricted site footprint demanded careful management of deliveries, traffic movements and construction activities. The construction of a substantial split-level basement also required complex temporary works to support the surrounding infrastructure throughout the excavation phase.
Value
£18 million
Location
Caterham, Surrey
Architect
Calford Seaden
Project Manager
Gleeds
Form of Contract
JCT Design & Build
Completion Date
February 2024
Capabilities:
Complex Structural Works
Complex Temporary Works
Considerate Constructors
Design & Build
Higher Risk Buildings
Railway Interface
Restricted Site
Soil Remediation
Stakeholder Management
Steeply Sloping Site
Our Approach

Early engagement with Surrey County Council, Network Rail and other stakeholders helped establish a coordinated delivery strategy and maintain programme certainty throughout the works.

A detailed traffic management plan was implemented, incorporating temporary highway arrangements, utility diversions and carefully controlled delivery schedules to minimise disruption to the surrounding area.

To respond to the constraints of the site, the superstructure was constructed using light-gauge steel framing and permanent steel formwork systems, reducing site handling requirements and improving construction efficiency. Regular collaboration with the design team ensured technical coordination and quality were maintained throughout.

Sustainability measures included a Blue Roof Sustainable Drainage System (SuDS), green roof areas and solar photovoltaic installations to improve the environmental performance of the development.

Image
Outcome

The project successfully transformed a challenging brownfield site into a high-quality mixed-use development, delivering much-needed affordable housing and new retail provision for the local community.

Through careful planning, stakeholder engagement and innovative construction techniques, the scheme was delivered safely within a constrained urban environment while minimising disruption to local residents and infrastructure.

The strong working relationship developed throughout the project was reflected in a 94% customer satisfaction score, with the client subsequently approaching Sinden to negotiate a further scheme.