Altitude
With residents remaining in their homes throughout, the works had to be carefully managed around an occupied building. The combination of different construction types, extensive external works and access constraints added further complexity to delivery.
Sinden adopted a flexible, phased approach, adapting the programme as areas became available and progressing multiple elevations where possible.
The programme was also adapted to incorporate additional works where required, reducing the need for future remobilisation and further disruption to residents.
The completed works have addressed the building’s identified fire safety requirements and enhanced the safety of residents’ homes.
By combining flexible delivery with proactive resident engagement, Sinden successfully completed a complex programme of works in an occupied residential environment, with safety and quality at the forefront throughout.
For residents, the outcome is simple but important: a safer home and greater certainty for the future.